The Bentonville Project

The Bentonville Project

RECENT PROJECTS The Bentonville Project This 3 story, 80,000 square foot multi-purpose facility includes learning centers, event spaces, catering kitchen, enclosed and open office/work stations and yoga/meditation area. The primary source for space conditioning is...
Pepsi Tenant Infill

Pepsi Tenant Infill

RECENT PROJECTS Pepsi Co Tenant Infill This project is an 11,000sqft multi-level tenant infill.  The air distribution system included the addition of (18) fan powered VAV boxes, high pressure double wall spiral duct & low pressure lined duct.  The system was...
Southwest Jr High School Addition and New Fieldhouse

Southwest Jr High School Addition and New Fieldhouse

RECENT PROJECTS Southwest Jr High School Addition and New Fieldhouse This 182,000 square foot S.T.E.M. based school was built for the Springdale Public School System. The mechanical system utilized roof top DX cooling, natural gas heat with multiple electric re-heat...
Flagstone Church of Christ

Flagstone Church of Christ

RECENT PROJECTS Flagstone Church of Christ This 25,170 square foot addition to the Flagstone Church of Christ in Bentonville utilizes both packaged and split system DX cooling with natural gas heating. The system consists of two 20-ton ground mounted package units to...